|
|

Ground Cover |
| |
Fill Dirt |
|
|
| |
Processed Topsoil |
|
|
| |
Bedmix |
|
|
| |
Leaf Compost |
|
|
| |
Sweet Peet |
|
|
| |
Hardwood Bark Mulch |
|
|
| |
Alabama Auburn |
|
|
| |
Black Amerimulch |
|
|
| |
Brown Amerimulch |
|
|
| |
Kids Karpet - call for availability |
|
|
| |
Straw |
|
|
|
Aggregates |
| |
#34 River Gravel: 1" - 3.5" |
|
|
| |
#57 River Gravel: 3/8" - 3/4" |
|
|
| |
#10 Limestone: Fines |
|
|
| |
#57 Limestone: 3/8" - 3/4" |
|
|
| |
#411 Limestone: Fines - 3/4" |
|
|
| |
Concrete Sand: Setting bed |
|
|
| |
Materials sold loose, allow for compaction |
|
|
HOW MUCH MATERIAL WILL I NEED?
Multiply length and width of the area to cover, to calculate
square
footage. Locate square footage on the chart below and locate
the
depth you need. The number in the column will tell you the
number of
cubic yards required. NOTE - Add 20% for compacted material.
| |
|
DEPTH |
|
| |
|
2" |
3" |
4" |
6" |
8" |
12" |
|
| |
Sq.Ft. |
CUBIC YARDS OF MATERIAL NEEDED |
|
| |
50 |
1/4 |
1/2 |
1/2 |
1 |
1+ |
2 |
|
| |
100 |
1/2 |
1- |
1+ |
2 |
2.5 |
4 |
|
| |
150 |
1 |
1-1/2 |
2 |
3 |
4 |
6 |
|
| |
200 |
1+ |
2 |
2.5 |
3.5 |
5 |
7.5 |
|
| |
250 |
1.5 |
2.5 |
3 |
4.5 |
6 |
9 |
|
| |
300 |
2 |
3 |
3.5 |
5.5 |
7.5 |
11 |
|
| |
350 |
2+ |
3.5 |
4.5 |
6.5 |
9 |
13 |
|
| |
400 |
2.5 |
4 |
5 |
7.5 |
10 |
15 |
|
| |
450 |
3 |
4.5 |
5.5 |
8.5 |
11 |
17 |
|
| |
500 |
3+ |
4.5 |
6 |
9 |
12 |
18.5 |
|
| |
550 |
3.5 |
5 |
7 |
10 |
13.5 |
20 |
|
| |
600 |
3.5 |
5.5 |
7.5 |
11 |
15 |
22 |
|
| |
650 |
4 |
6 |
8 |
12 |
16 |
24 |
|
| |
700 |
4+ |
6.5 |
8.5 |
13 |
17 |
26 |
|
| |
750 |
4.5 |
7 |
9.5 |
14 |
18.5 |
28 |
|
| |
800 |
5+ |
7.5 |
10 |
15 |
20 |
30 |
|
| |
850 |
5.5 |
8 |
10.5 |
15.5 |
21 |
31 |
|
| |
900 |
5.5 |
8.5 |
11 |
17 |
22 |
33 |
|
| |
950 |
6 |
9 |
12 |
17.5 |
23 |
35 |
|
| |
1000 |
6 |
9 |
12 |
18.5 |
25 |
37 |
|
|
|